Solutions / RAMS & method statements
Take existing RAMS into a structured review workflow.
RAMS can span long tables and continued pages. Netriam extracts the source content into editable sections, with tools to correct table structure, remove blank rows and place supporting source graphics.
What this looks like in practice
Bring an existing method statement into Confirmation. Check the sequence of works, hazards, controls and risk ratings, then produce a usable export after your review.
What to check
- Check pre-control and residual ratings against their exact hazard rows.
- Preserve genuine multiple ratings; repetition does not always mean duplication.
- Check continued rows, table headers and the complete risk matrix before export.
Where human judgement matters
Netriam does not approve a safe system of work. A competent person must check the RAMS and decide whether the hazards and controls are appropriate. AI extraction is not guaranteed to be 100% accurate.
Try it with your own paperwork.
Start with a representative document and see how much manual work the structured starting point removes.